← Malmesbury St Johns Street

Spill evidence · River Hub

Malmesbury St Johns Street

Pumping station overflow · WXW01042 · feeds MALMESBURY STW
Wet weather

The discharge

Spill day
Tuesday, 3 February 2026
Started
3 Feb 2026, 18:26
Ended
3 Feb 2026, 18:54
Duration
27 minutes 51 seconds
Receiving water
Tetbury Avon - unnamed trib to conf Sherston Avon
Parish
Malmesbury

Rainfall evidence

Daily rainfall at the matched gauge (Shipton Moyne) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
03/02/2026 (spill day)12.271 mmrain
02/02/20262.544 mmrain
01/02/20265.574 mmrain
31/01/20261.95 mmrain
30/01/20263.011 mmrain

River flow that day: 30.693 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01042). Rainfall: EA Hydrology gauge b6ebb017-63b5-4f30-8b6b-63dfed5f1e4f. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Rural Data.