← Box Mill Lane

Spill evidence · River Hub

Box Mill Lane

Pumping station overflow · WXW00735 · feeds BOX STW
Wet weather

The discharge

Spill day
Tuesday, 9 December 2025
Started
9 Dec 2025, 10:09
Ended
9 Dec 2025, 13:16
Duration
3 hours 7 minutes
Receiving water
By Bk - conf Doncombe Bk to conf R Avon (Brist)
Parish
Box

Rainfall evidence

Daily rainfall at the matched gauge (Bath Claverton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/12/2025 (spill day)2.405 mmrain
08/12/202513.292 mmrain
07/12/20253.833 mmrain
06/12/20253.723 mmrain
05/12/20258.158 mmrain

River flow that day: 69.563 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
40 counted spills · 165 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00735). Rainfall: EA Hydrology gauge c4cceecc-19e7-471d-b57a-d04d88db1da6. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Rural Data.
Spill evidence — Box Mill Lane — Bristol Avon Rural Data