← Broughton Gifford the Green

Spill evidence · River Hub

Broughton Gifford the Green

Pumping station overflow · WXW01121 · feeds MELKSHAM STW
Wet weather

The discharge

Spill day
Monday, 1 December 2025
Started
1 Dec 2025, 22:12
Ended
1 Dec 2025, 23:19
Duration
1 hour 7 minutes
Receiving water
Chalfield Brook - source to conf Avon
Parish
Broughton Gifford

Rainfall evidence

Daily rainfall at the matched gauge (Bowerhill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
01/12/2025 (spill day)10.2 mmrain
30/11/20256.8 mmrain
29/11/20250 mmdry
28/11/20256.4 mmrain
27/11/20250.6 mmrain

River flow that day: 29.193 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
14 counted spills · 170 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01121). Rainfall: EA Hydrology gauge c63c7d7d-7c68-433b-9c6a-2ce5c1e90d2e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Rural Data.