← Lea North

Spill evidence · River Hub

Lea North

Pumping station overflow · WXW00624 · feeds MALMESBURY STW
Wet weather

The discharge

Spill day
Monday, 27 January 2025
Started
27 Jan 2025, 16:30
Ended
27 Jan 2025, 19:45
Duration
3 hours 15 minutes
Receiving water
Woodbridge Bk - source to conf Charlton Str
Parish
Lea and Cleverton

Rainfall evidence

Daily rainfall at the matched gauge (Great Somerford) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/01/2025 (spill day)13.665 mmrain
26/01/202528.797 mmrain
25/01/20252.89 mmrain
24/01/20251.433 mmrain
23/01/202512.476 mmrain

River flow that day: 31.652 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
18 counted spills · 135 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00624). Rainfall: EA Hydrology gauge 44782f5b-baba-458a-a644-ecedea4c9cda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Rural Data.