← Rowde Tower View

Spill evidence · River Hub

Rowde Tower View

Pumping station overflow · WXW01148 · feeds ROWDE STW
Wet weather

The discharge

Spill day
Sunday, 25 February 2024
Started
25 Feb 2024, 16:00
Ended
25 Feb 2024, 17:45
Duration
1 hour 45 minutes
Receiving water
Summerham Brook
Parish
Rowde

Rainfall evidence

Daily rainfall at the matched gauge (Bowerhill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/02/2024 (spill day)6.4 mmrain
24/02/20240.2 mmdry
23/02/20240.8 mmrain
22/02/20245.8 mmrain
21/02/20248 mmrain

River flow that day: 34.941 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
62 counted spills · 324 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01148). Rainfall: EA Hydrology gauge c63c7d7d-7c68-433b-9c6a-2ce5c1e90d2e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Rural Data.
Spill evidence — Rowde Tower View — Bristol Avon Rural Data