← Radstock Kilmersdon Road Syphon

Spill evidence · River Hub

Radstock Kilmersdon Road Syphon

Combined sewer overflow · WXW00593 · feeds RADSTOCK STW CATCHMENT
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Monday, 23 September 2024
Started
23 Sept 2024, 13:04
Ended
23 Sept 2024, 17:54
Duration
4 hours 50 minutes
Receiving water
Snails Bk - source to conf Kilmersdon Str
Parish
Radstock

Rainfall evidence

Daily rainfall at the matched gauge (Paulton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/09/2024 (spill day)0 mmdry
22/09/20240 mmdry
21/09/20240.8 mmrain
20/09/20241.8 mmrain
19/09/20240 mmdry

River flow that day: 1.883 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
35 counted spills · 27 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00593). Rainfall: EA Hydrology gauge 202bf87b-a369-4936-98d0-0830f34d93d3. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Rural Data.