← Bristol Hanham Polly Barnes Hill

Spill evidence · River Hub

Bristol Hanham Polly Barnes Hill

Combined sewer overflow · WXW00864 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Sunday, 5 January 2025
Started
5 Jan 2025, 08:24
Ended
5 Jan 2025, 08:58
Duration
34 minutes
Receiving water
Bristol Avon (By Bk to Netham Weir)
Parish
Hanham

Rainfall evidence

Daily rainfall at the matched gauge (Keynsham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
05/01/2025 (spill day)20.97 mmrain
04/01/202520.07 mmrain
03/01/20250.081 mmdry
02/01/20250.064 mmdry
01/01/20259.595 mmrain

River flow that day: 57.167 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
57 counted spills · 74 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00864). Rainfall: EA Hydrology gauge 377eecad-abaf-409d-862e-61a885267910. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.
Spill evidence — Bristol Hanham Polly Barnes Hill — Bristol Avon Urban Data