← Bath Beckhampton Road O/s No 50

Spill evidence · River Hub

Bath Beckhampton Road O/s No 50

Combined sewer overflow · WXW00119 · feeds BATH STW
Wet weather

The discharge

Spill day
Monday, 15 December 2025
Started
15 Dec 2025, 19:07
Ended
15 Dec 2025, 19:45
Duration
38 minutes
Receiving water
Bristol Avon (By Bk to Netham Weir)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Bath Claverton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
15/12/2025 (spill day)21.443 mmrain
14/12/20250.481 mmrain
13/12/20250.039 mmdry
12/12/20250.993 mmrain
11/12/20252.858 mmrain

River flow that day: 33.388 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
21 counted spills · 9 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00119). Rainfall: EA Hydrology gauge c4cceecc-19e7-471d-b57a-d04d88db1da6. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.
Spill evidence — Bath Beckhampton Road O/s No 50 — Bristol Avon Urban Data