← Bristol Sea Mills Lane Nr Bridge

Spill evidence · River Hub

Bristol Sea Mills Lane Nr Bridge

Combined sewer overflow · WXW00967 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Tuesday, 17 November 2026
Started
17 Nov 2026, 06:10
Ended
17 Nov 2026, 06:36
Duration
26 minutes
Receiving water
Trym - source to conf R Avon (Brist)
Parish
Abbots Leigh

Rainfall evidence

Daily rainfall at the matched gauge (Clifton Oakfield) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/11/2026 (spill day)20 mmrain
16/11/202626 mmrain
15/11/202611 mmrain
14/11/20262.4 mmrain
13/11/20260 mmdry

River flow that day: 7.304 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00967). Rainfall: EA Hydrology gauge e584b095-fa71-4106-b877-bfdd9a248d29. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.