← Bath Batheaston By-pass

Spill evidence · River Hub

Bath Batheaston By-pass

Combined sewer overflow · WXW00636 · feeds BATH STW
Wet weather

The discharge

Spill day
Sunday, 17 March 2024
Started
17 Mar 2024, 02:00
Ended
18 Mar 2024, 00:48
Duration
22 hours 48 minutes
Receiving water
Bristol Avon (By Bk to Netham Weir)
Parish
Bathampton

Rainfall evidence

Daily rainfall at the matched gauge (Bath Claverton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/03/2024 (spill day)0.2 mmdry
16/03/202412 mmrain
15/03/20246.8 mmrain
14/03/20242 mmrain
13/03/20240.2 mmdry

River flow that day: 15.785 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
116 counted spills · 1374 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00636). Rainfall: EA Hydrology gauge c4cceecc-19e7-471d-b57a-d04d88db1da6. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.