← Bath Lower Bristol Road Near Mill Lane
Spill evidence · River Hub
Bath Lower Bristol Road Near Mill Lane
Combined sewer overflow · WXW01202 · feeds BATH STW
Wet weather
The discharge
- Spill day
- Sunday, 24 November 2024
- Started
- 24 Nov 2024, 12:02
- Ended
- 24 Nov 2024, 13:04
- Duration
- 1 hour 2 minutes
- Receiving water
- Bristol Avon (By Bk to Netham Weir)
- Parish
- Newton St. Loe
Rainfall evidence
Daily rainfall at the matched gauge (Bath Claverton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 24/11/2024 (spill day) | 40.021 mm | rain |
| 23/11/2024 | 30.777 mm | rain |
| 22/11/2024 | 3.556 mm | rain |
| 21/11/2024 | 0 mm | dry |
| 20/11/2024 | 0.272 mm | rain |
River flow that day: 97.768 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.7 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2024)
- 14 counted spills · 7 h total
- Monitor uptime (2024)
- 99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01202). Rainfall: EA Hydrology gauge c4cceecc-19e7-471d-b57a-d04d88db1da6. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.