← Bristol Kingswood New Cheltenham Road No 84

Spill evidence · River Hub

Bristol Kingswood New Cheltenham Road No 84

Combined sewer overflow · WXW00054 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Tuesday, 4 August 2026
Started
4 Aug 2026, 17:06
Ended
4 Aug 2026, 17:22
Duration
16 minutes
Receiving water
Siston Bk - source to conf R Avon (Brist)
Parish
Kingswood

Rainfall evidence

Daily rainfall at the matched gauge (Keynsham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
04/08/2026 (spill day)5.4 mmrain
03/08/20260 mmdry
02/08/20260 mmdry
01/08/20260 mmdry
31/07/20260 mmdry

River flow that day: 0.385 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00054). Rainfall: EA Hydrology gauge 377eecad-abaf-409d-862e-61a885267910. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.