← Bristol Central Industrial Estate Bath Road

Spill evidence · River Hub

Bristol Central Industrial Estate Bath Road

Combined sewer overflow · WXW00241 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Thursday, 5 December 2024
Started
5 Dec 2024, 17:24
Ended
5 Dec 2024, 17:52
Duration
28 minutes
Receiving water
The Malago - source to conf R Avon (Brist New Cut)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Clifton Oakfield) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
05/12/2024 (spill day)12.8 mmrain
04/12/20247.6 mmrain
03/12/20240 mmdry
02/12/20241 mmrain
01/12/20242 mmrain

River flow that day: 17.348 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
11 counted spills · 2 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00241). Rainfall: EA Hydrology gauge e584b095-fa71-4106-b877-bfdd9a248d29. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.
Spill evidence — Bristol Central Industrial Estate Bath Road — Bristol Avon Urban Data