← Bristol Cumberland Road Old Gaol Siphon

Spill evidence · River Hub

Bristol Cumberland Road Old Gaol Siphon

Combined sewer overflow · WXW00356 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Wednesday, 3 January 2024
Started
3 Jan 2024, 08:22
Ended
3 Jan 2024, 13:26
Duration
5 hours 4 minutes
Receiving water
The Malago - source to conf R Avon (Brist New Cut)
Parish
Long Ashton

Rainfall evidence

Daily rainfall at the matched gauge (Clifton Oakfield) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
03/01/2024 (spill day)5.6 mmrain
02/01/202422.6 mmrain
01/01/202416.8 mmrain
31/12/202310 mmrain
30/12/202312.2 mmrain

River flow that day: 33.423 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
11 counted spills · 31 h total
Monitor uptime (2024)
97% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00356). Rainfall: EA Hydrology gauge e584b095-fa71-4106-b877-bfdd9a248d29. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.
Spill evidence — Bristol Cumberland Road Old Gaol Siphon — Bristol Avon Urban Data