← Bristol Cumberland Road Old Gaol Siphon

Spill evidence · River Hub

Bristol Cumberland Road Old Gaol Siphon

Combined sewer overflow · WXW00356 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Sunday, 22 September 2024
Started
22 Sept 2024, 09:34
Ended
22 Sept 2024, 10:24
Duration
50 minutes
Receiving water
The Malago - source to conf R Avon (Brist New Cut)
Parish
Long Ashton

Rainfall evidence

Daily rainfall at the matched gauge (Clifton Oakfield) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
22/09/2024 (spill day)21.6 mmrain
21/09/202413 mmrain
20/09/20245 mmrain
19/09/20240 mmdry
18/09/20240 mmdry

River flow that day: 2.315 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
11 counted spills · 31 h total
Monitor uptime (2024)
97% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00356). Rainfall: EA Hydrology gauge e584b095-fa71-4106-b877-bfdd9a248d29. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.