← Bristol Feeder Road / Barton Hill Bridge

Spill evidence · River Hub

Bristol Feeder Road / Barton Hill Bridge

Combined sewer overflow · WXW00419 · feeds BRISTOL STW
Wet weather

The discharge

Spill day
Saturday, 2 May 2026
Started
2 May 2026, 19:08
Ended
2 May 2026, 20:10
Duration
1 hour 2 minutes
Receiving water
Bristol Avon (By Bk to Netham Weir)
Parish
Hanham

Rainfall evidence

Daily rainfall at the matched gauge (Clifton Oakfield) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
02/05/2026 (spill day)18.6 mmrain
01/05/20260.8 mmrain
30/04/20260 mmdry
29/04/20260 mmdry
28/04/20260 mmdry

River flow that day: 1.898 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00419). Rainfall: EA Hydrology gauge e584b095-fa71-4106-b877-bfdd9a248d29. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.
Spill evidence — Bristol Feeder Road / Barton Hill Bridge — Bristol Avon Urban Data