← Batheaston Coalpit Road Junction With London Road
Spill evidence · River Hub
Batheaston Coalpit Road Junction With London Road
Combined sewer overflow · WXW01048 · feeds BATH STW
Wet weather
The discharge
- Spill day
- Tuesday, 19 May 2026
- Started
- 19 May 2026, 17:16
- Ended
- 19 May 2026, 17:46
- Duration
- 30 minutes
- Receiving water
- Bristol Avon (By Bk to Netham Weir)
- Parish
- Batheaston
Rainfall evidence
Daily rainfall at the matched gauge (Bath Claverton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 19/05/2026 (spill day) | 7.765 mm | rain |
| 18/05/2026 | 3.967 mm | rain |
| 17/05/2026 | 1.492 mm | rain |
| 16/05/2026 | 1.286 mm | rain |
| 15/05/2026 | 1.679 mm | rain |
River flow that day: 3.014 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.5 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01048). Rainfall: EA Hydrology gauge c4cceecc-19e7-471d-b57a-d04d88db1da6. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.