← Keynsham High Level Ps Avon Mill Lane

Spill evidence · River Hub

Keynsham High Level Ps Avon Mill Lane

Pumping station overflow · WXW00589 · feeds KEYNSHAM STW
Wet weather

The discharge

Spill day
Tuesday, 20 January 2026
Started
20 Jan 2026, 19:14
Ended
20 Jan 2026, 21:46
Duration
2 hours 32 minutes
Receiving water
Bristol Avon (By Bk to Netham Weir)
Parish
Keynsham

Rainfall evidence

Daily rainfall at the matched gauge (Keynsham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
20/01/2026 (spill day)10.019 mmrain
19/01/20265.777 mmrain
18/01/20268.939 mmrain
17/01/20260.041 mmdry
16/01/202610.381 mmrain

River flow that day: 22.697 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00589). Rainfall: EA Hydrology gauge 377eecad-abaf-409d-862e-61a885267910. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.