← Iron Acton Hoovers Lane
Spill evidence · River Hub
Iron Acton Hoovers Lane
Combined sewer overflow · WXW00786 · feeds BRISTOL STW
Wet weather
The discharge
- Spill day
- Friday, 6 February 2026
- Started
- 6 Feb 2026, 17:47
- Ended
- 6 Feb 2026, 19:51
- Duration
- 2 hours 3 minutes
- Receiving water
- Frome (Brist) - source to conf Laddon Bk
- Parish
- Frampton Cotterell
Rainfall evidence
Daily rainfall at the matched gauge (Frampton Cotterell Mill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 06/02/2026 (spill day) | 8.8 mm | rain |
| 05/02/2026 | 5.6 mm | rain |
| 04/02/2026 | 0.6 mm | rain |
| 03/02/2026 | 3.8 mm | rain |
| 02/02/2026 | 0.4 mm | rain |
River flow that day: 30.619 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 1.0 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00786). Rainfall: EA Hydrology gauge aaf8fe03-f3db-43f4-8ce6-701ebfac9ca7_5302070SC. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Bristol Avon Urban Data.