← Blowing Hse Ln, Bodmin
Spill evidence · River Hub
Blowing Hse Ln, Bodmin
Combined sewer overflow · SBB00121 · feeds BODMIN (NANSTALLON) STW
No rain data
The discharge
- Spill day
- Wednesday, 12 February 2020
- Started
- 12 Feb 2020, 22:46
- Ended
- 12 Feb 2020, 23:18
- Duration
- 32 minutes
- Receiving water
- St Lawrence Stream
- Parish
- Lanivet
Rainfall evidence
Daily rainfall at the matched gauge (Bodmin Callywith) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 12/02/2020 (spill day) | no data | |
| 11/02/2020 | no data | |
| 10/02/2020 | no data | |
| 09/02/2020 | no data | |
| 08/02/2020 | no data |
River flow that day: 18.855 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 3.8 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Camel Estuary
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00121). Rainfall: EA Hydrology gauge 65e770aa-72b5-4df7-8e24-23655a7e1cf5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Camel Data.