← Vines Cross, - 115888

Spill evidence · River Hub

Vines Cross, - 115888

Storm overflow at the works · SWS00903 · feeds HEATHFIELD, HORHAM STW"
Wet weather

The discharge

Spill day
Wednesday, 7 January 2026
Started
7 Jan 2026, 08:05
Ended
7 Jan 2026, 10:17
Duration
2 hours 12 minutes
Receiving water
Waldron Ghyll
Parish
Horam

Rainfall evidence

Daily rainfall at the matched gauge (Overton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
07/01/2026 (spill day)1.08 mmrain
06/01/20267.54 mmrain
05/01/20260.11 mmdry
04/01/20260.03 mmdry
03/01/20260.03 mmdry

River flow that day: 4.185 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00903). Rainfall: EA Hydrology gauge 95d41928-f47b-4b8c-b449-0fdcb9770c8a. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Cuckmere Data.