← Huggetts Farm Horam Ceo - 108258

Spill evidence · River Hub

Huggetts Farm Horam Ceo - 108258

Pumping station overflow · SWS00455 · feeds HEATHFIELD, HORHAM STW"
Wet weather

The discharge

Spill day
Thursday, 23 October 2025
Started
23 Oct 2025, 03:30
Ended
23 Oct 2025, 12:15
Duration
8 hours 45 minutes
Receiving water
Bull River from Foxhunt Green to Lower Horsebridge
Parish
Heathfield and Waldron

Rainfall evidence

Daily rainfall at the matched gauge (Overton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/10/2025 (spill day)2.82 mmrain
22/10/202510.27 mmrain
21/10/20250.42 mmrain
20/10/202511.85 mmrain
19/10/202523.37 mmrain

River flow that day: 3.92 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
31 counted spills · 157 h total
Monitor uptime (2025)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00455). Rainfall: EA Hydrology gauge 95d41928-f47b-4b8c-b449-0fdcb9770c8a. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Cuckmere Data.
Spill evidence — Huggetts Farm Horam Ceo - 108258 — River Cuckmere Data