← Gillingham Buckingham Road

Spill evidence · River Hub

Gillingham Buckingham Road

Pumping station overflow · WXW00207 · feeds GILLINGHAM STW
Wet weather

The discharge

Spill day
Friday, 6 September 2024
Started
6 Sept 2024, 11:30
Ended
6 Sept 2024, 20:00
Duration
8 hours 30 minutes
Receiving water
Stour (Headwaters)
Parish
Gillingham

Rainfall evidence

Daily rainfall at the matched gauge (Gillingham Common Mead Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
06/09/2024 (spill day)16.24 mmrain
05/09/202423.64 mmrain
04/09/20241.66 mmrain
03/09/20240.18 mmdry
02/09/20242.48 mmrain

River flow that day: 2.961 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
60 counted spills · 369 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00207). Rainfall: EA Hydrology gauge 71ad8409-f13d-4b7c-a2bb-23df4049f394. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.