← Gillingham Buckingham Road

Spill evidence · River Hub

Gillingham Buckingham Road

Pumping station overflow · WXW00207 · feeds GILLINGHAM STW
Wet weather

The discharge

Spill day
Wednesday, 18 November 2026
Started
18 Nov 2026, 22:47
Ended
18 Nov 2026, 23:07
Duration
20 minutes
Receiving water
Stour (Headwaters)
Parish
Gillingham

Rainfall evidence

Daily rainfall at the matched gauge (Gillingham Common Mead Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/11/2026 (spill day)5.22 mmrain
17/11/20262.95 mmrain
16/11/202611.03 mmrain
15/11/20267.72 mmrain
14/11/20261.13 mmrain

River flow that day: 4.487 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 0.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00207). Rainfall: EA Hydrology gauge 71ad8409-f13d-4b7c-a2bb-23df4049f394. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.