← Kinson New Road Northbourne Storm Tank
Spill evidence · River Hub
Kinson New Road Northbourne Storm Tank
Storm overflow at the works · WXW00602 · feeds BOURNEMOUTH (KINSON) STW
Wet weather
The discharge
- Spill day
- Thursday, 4 April 2024
- Started
- 4 Apr 2024, 08:15
- Ended
- 4 Apr 2024, 08:30
- Duration
- 15 minutes
- Receiving water
- Stour (Lower)
- Parish
- West Parley
Rainfall evidence
Daily rainfall at the matched gauge (Holdenhurst) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 04/04/2024 (spill day) | 6.33 mm | rain |
| 03/04/2024 | 5.18 mm | rain |
| 02/04/2024 | 11.6 mm | rain |
| 01/04/2024 | 3.57 mm | rain |
| 31/03/2024 | 6.38 mm | rain |
River flow that day: 23.575 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.6 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Christchurch Avon Beach; Christchurch Friar`s Cliff
- Shellfish water
- North East Wash
- EA annual return (2024)
- 37 counted spills · 407 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00602). Rainfall: EA Hydrology gauge ea79c66d-88d9-409c-b57f-78a40c9ff45e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.