← Buckland Newton Duntish Inlet

Spill evidence · River Hub

Buckland Newton Duntish Inlet

Storm overflow at the works · WXW00208 · feeds BUCKLAND NEWTON STW CATCHMENT
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 3-day window
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Thursday, 25 December 2025
Started
25 Dec 2025, 09:24
Ended
25 Dec 2025, 11:44
Duration
2 hours 19 minutes
Receiving water
Lydden (Upper)
Parish
Buckland Newton

Rainfall evidence

Daily rainfall at the matched gauge (Kingstag Ridge Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Wet weather
DateRainfall
25/12/2025 (spill day)0 mmdry
24/12/20250 mmdry
23/12/20250 mmdry
22/12/20250.15 mmdry
21/12/20258.69 mmrain

River flow that day: 10.665 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2025)
108 counted spills · 1684 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00208). Rainfall: EA Hydrology gauge 99e82d91-febb-4d8c-b75c-a898bb560812. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.