← Buckland Newton Duntish Inlet

Spill evidence · River Hub

Buckland Newton Duntish Inlet

Storm overflow at the works · WXW00208 · feeds BUCKLAND NEWTON STW CATCHMENT
Dry spill

Evidence strength

Low confidence
  • ✓ Dry on the EA 1-day window
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Tuesday, 17 March 2026
Started
17 Mar 2026, 22:12
Ended
17 Mar 2026, 22:41
Duration
29 minutes
Receiving water
Lydden (Upper)
Parish
Buckland Newton

Rainfall evidence

Daily rainfall at the matched gauge (Kingstag Ridge Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/03/2026 (spill day)0.03 mmdry
16/03/20260.02 mmdry
15/03/20261.94 mmrain
14/03/20260 mmdry
13/03/20261.21 mmrain

River flow that day: 5.32 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00208). Rainfall: EA Hydrology gauge 99e82d91-febb-4d8c-b75c-a898bb560812. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.
Spill evidence — Buckland Newton Duntish Inlet — River Dorset Stour Data