← Wimborne Brook Road Storm Tank

Spill evidence · River Hub

Wimborne Brook Road Storm Tank

Storm overflow at the works · WXW01264 · feeds WIMBORNE STW
Wet weather

The discharge

Spill day
Saturday, 30 March 2024
Started
30 Mar 2024, 22:04
Ended
30 Mar 2024, 22:46
Duration
42 minutes
Receiving water
Stour (Lower)
Parish
Wimborne Minster

Rainfall evidence

Daily rainfall at the matched gauge (Alderney) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
30/03/2024 (spill day)0 mmdry
29/03/20240.41 mmrain
28/03/202414.79 mmrain
27/03/202411.92 mmrain
26/03/20247.86 mmrain

River flow that day: 15.415 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
72 counted spills · 1093 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01264). Rainfall: EA Hydrology gauge e01eaf91-3a94-47d2-a987-d24706fec3bd. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.
Spill evidence — Wimborne Brook Road Storm Tank — River Dorset Stour Data