← Stalbridge

Spill evidence · River Hub

Stalbridge

Pumping station overflow · WXW01046 · feeds MARNHULL STW
Wet weather

The discharge

Spill day
Tuesday, 8 October 2024
Started
8 Oct 2024, 10:30
Ended
9 Oct 2024, 19:25
Duration
1 day 8 hours
Receiving water
Stour Trib (Bibbern Brook)
Parish
Stalbridge

Rainfall evidence

Daily rainfall at the matched gauge (Kingstag Ridge Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/10/2024 (spill day)19.54 mmrain
07/10/202414.63 mmrain
06/10/202410.79 mmrain
05/10/20240.75 mmrain
04/10/20240 mmdry

River flow that day: 19.576 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
60 counted spills · 585 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01046). Rainfall: EA Hydrology gauge 99e82d91-febb-4d8c-b75c-a898bb560812. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.