← Blandford Langton Road (blandford No 1)

Spill evidence · River Hub

Blandford Langton Road (blandford No 1)

Pumping station overflow · WXW00618 · feeds BLANDFORD FORUM STW
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)

The discharge

Spill day
Sunday, 1 February 2026
Started
1 Feb 2026, 08:10
Ended
1 Feb 2026, 11:54
Duration
3 hours 44 minutes
Receiving water
Stour (Middle d/s Pimperne Brook)
Parish
Blandford Forum

Rainfall evidence

Daily rainfall at the matched gauge (Black Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
01/02/2026 (spill day)0.2 mmdry
31/01/20260 mmdry
30/01/20260 mmdry
29/01/20260 mmdry
28/01/20260.2 mmdry

River flow that day: 19.727 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00618). Rainfall: EA Hydrology gauge 91a0bc46-6c53-4857-8ad7-e94414fd2a40_344137. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Dorset Stour Data.