← O/s 58 Thomas St, Penryn
Spill evidence · River Hub
O/s 58 Thomas St, Penryn
Combined sewer overflow · SBB01160 · feeds FALMOUTH STW
Dry spill
Evidence strength
Medium confidence- ✓ Dry across a 4-day antecedent window
- ✓ Rain gauge close (≤5 km)
- ⚠ Short discharge (<1 h) — weaker signal
The discharge
- Spill day
- Monday, 11 May 2026
- Started
- 11 May 2026, 21:23
- Ended
- 11 May 2026, 21:40
- Duration
- 16 minutes 59 seconds
- Receiving water
- Kennal
- Parish
- Penryn
Rainfall evidence
Daily rainfall at the matched gauge (Penryn) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
| Date | Rainfall | |
|---|---|---|
| 11/05/2026 (spill day) | 0 mm | dry |
| 10/05/2026 | 0 mm | dry |
| 09/05/2026 | 0 mm | dry |
| 08/05/2026 | 0 mm | dry |
| 07/05/2026 | 0 mm | dry |
River flow that day: 1.21 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 1.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Fal Estuary
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01160). Rainfall: EA Hydrology gauge a085d57a-b72f-4ddc-ac54-e139195cd693. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Fal Data.