← 39 St Michaels Road, Ponsonooth

Spill evidence · River Hub

39 St Michaels Road, Ponsonooth

Combined sewer overflow · SBB00027 · feeds PONSANOOTH STW
No rain data

The discharge

Spill day
Sunday, 1 November 2020
Started
1 Nov 2020, 21:59
Ended
2 Nov 2020, 01:27
Duration
3 hours 27 minutes
Receiving water
Kennal
Parish
Ponsanooth

Rainfall evidence

Daily rainfall at the matched gauge (Gwennap) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
01/11/2020 (spill day)no data
31/10/2020no data
30/10/2020no data
29/10/2020no data
28/10/2020no data

River flow that day: 10.12 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Fal Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00027). Rainfall: EA Hydrology gauge e683ab18-2507-43b3-b901-ef518d3657df. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Fal Data.