← Trelander Highway, Truro

Spill evidence · River Hub

Trelander Highway, Truro

Combined sewer overflow · SBB01282 · feeds TRURO (NEWHAM) STW
No rain data

The discharge

Spill day
Saturday, 5 December 2020
Started
5 Dec 2020, 01:32
Ended
5 Dec 2020, 02:10
Duration
37 minutes 40 seconds
Receiving water
Kenwyn
Parish
Truro

Rainfall evidence

Daily rainfall at the matched gauge (Truro) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
05/12/2020 (spill day)no data
04/12/2020no data
03/12/2020no data
02/12/2020no data
01/12/2020no data

River flow that day: 6.263 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Fal Estuary
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01282). Rainfall: EA Hydrology gauge 0eb77beb-d98e-48f1-9e2d-e494be9b5354. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Fal Data.
Spill evidence — Trelander Highway, Truro — River Fal Data