← Newham Road pumping station, Truro

Spill evidence · River Hub

Newham Road pumping station, Truro

Pumping station overflow · SBB00992 · feeds TRURO (NEWHAM) STW
No rain data

The discharge

Spill day
Thursday, 27 August 2020
Started
27 Aug 2020, 10:39
Ended
27 Aug 2020, 12:10
Duration
1 hour 31 minutes
Receiving water
Kenwyn
Parish
Truro

Rainfall evidence

Daily rainfall at the matched gauge (Truro) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
27/08/2020 (spill day)no data
26/08/2020no data
25/08/2020no data
24/08/2020no data
23/08/2020no data

River flow that day: 8.697 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Fal Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00992). Rainfall: EA Hydrology gauge 0eb77beb-d98e-48f1-9e2d-e494be9b5354. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Fal Data.
Spill evidence — Newham Road pumping station, Truro — River Fal Data