← Old Hill pumping station, Falmouth

Spill evidence · River Hub

Old Hill pumping station, Falmouth

Pumping station overflow · SBB00876 · feeds FALMOUTH STW
Wet weather

The discharge

Spill day
Thursday, 8 January 2026
Started
8 Jan 2026, 12:37
Ended
8 Jan 2026, 13:54
Duration
1 hour 16 minutes
Receiving water
Kennal
Parish
Penryn

Rainfall evidence

Daily rainfall at the matched gauge (Penryn) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/01/2026 (spill day)33.8 mmrain
07/01/20265.393 mmrain
06/01/20265.395 mmrain
05/01/20261.202 mmrain
04/01/20266.591 mmrain

River flow that day: 16.583 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Fal Estuary
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00876). Rainfall: EA Hydrology gauge a085d57a-b72f-4ddc-ac54-e139195cd693. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Fal Data.
Spill evidence — Old Hill pumping station, Falmouth — River Fal Data