← Junction A39 Fraddon

Spill evidence · River Hub

Junction A39 Fraddon

Combined sewer overflow · SBB00476 · feeds FRADDON STW
Wet weather

The discharge

Spill day
Thursday, 29 January 2026
Started
29 Jan 2026, 17:48
Ended
29 Jan 2026, 18:07
Duration
19 minutes 40 seconds
Receiving water
Gannel (Upper)
Parish
St. Enoder

Rainfall evidence

Daily rainfall at the matched gauge (St Dennis) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
29/01/2026 (spill day)19.601 mmrain
28/01/20265 mmrain
27/01/20262.201 mmrain
26/01/202646.001 mmrain
25/01/20260.1 mmdry

River flow that day: 32.726 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00476). Rainfall: EA Hydrology gauge 03fd9d1b-c6db-424c-a7e6-6800134b416c. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Gannel & Menalhyl Data.
Spill evidence — Junction A39 Fraddon — Gannel & Menalhyl Data