← Imperial Road Mount Pleasant Ceo - 111369

Spill evidence · River Hub

Imperial Road Mount Pleasant Ceo - 111369

Pumping station overflow · SWS00462 · feeds SOUTHAMPTON WEST (MILLBROOK) STW
Wet weather

The discharge

Spill day
Friday, 29 August 2025
Started
29 Aug 2025, 04:48
Ended
29 Aug 2025, 05:11
Duration
23 minutes 1 second
Receiving water
Monks Brook
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Portswood) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
29/08/2025 (spill day)0.16 mmdry
28/08/202523.69 mmrain
27/08/20254.86 mmrain
26/08/20251.39 mmrain
25/08/20250.03 mmdry

River flow that day: 1.006 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Southampton Water
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
7 counted spills · 15 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00462). Rainfall: EA Hydrology gauge eb5d2f5c-f57e-4272-9cf2-cb130d6a8b54. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Itchen Data.
Spill evidence — Imperial Road Mount Pleasant Ceo - 111369 — River Itchen Data