← Burnetts Lane Horton Heath Ceo - 108404

Spill evidence · River Hub

Burnetts Lane Horton Heath Ceo - 108404

Pumping station overflow · SWS00125 · feeds EASTLEIGH STW
Wet weather

The discharge

Spill day
Saturday, 2 March 2024
Started
2 Mar 2024, 02:08
Ended
2 Mar 2024, 15:54
Duration
13 hours 46 minutes
Receiving water
Itchen
Parish
Fair Oak and Horton Heath

Rainfall evidence

Daily rainfall at the matched gauge (Bishops Waltham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
02/03/2024 (spill day)0 mmdry
01/03/20249.36 mmrain
29/02/202418.15 mmrain
28/02/20245.38 mmrain
27/02/20240.01 mmdry

River flow that day: 14.886 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
31 counted spills · 302 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00125). Rainfall: EA Hydrology gauge 799c66f2-7cb8-4f49-acaa-8fc0869e077e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Itchen Data.
Spill evidence — Burnetts Lane Horton Heath Ceo - 108404 — River Itchen Data