← Spring Gardens Alresford Ceo - 108484

Spill evidence · River Hub

Spring Gardens Alresford Ceo - 108484

Pumping station overflow · SWS00804 · feeds ALRESFORD STW
Dry spill

Evidence strength

High confidence
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Thursday, 19 June 2025
Started
19 Jun 2025, 12:02
Ended
19 Jun 2025, 12:55
Duration
53 minutes
Receiving water
Itchen (Cheriton Stream)
Parish
New Alresford

Rainfall evidence

Daily rainfall at the matched gauge (Bishops Sutton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
19/06/2025 (spill day)0 mmdry
18/06/20250 mmdry
17/06/20250 mmdry
16/06/20250 mmdry
15/06/20250 mmdry

River flow that day: 2.182 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
0 counted spills · 0 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00804). Rainfall: EA Hydrology gauge 5d56abcb-da2f-4870-89f7-c3afb7559594. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Itchen Data.