← Newtown Road Newtown Ceo - 108461

Spill evidence · River Hub

Newtown Road Newtown Ceo - 108461

Pumping station overflow · SWS00604 · feeds FAREHAM AND GOSPORT, HAMBLE, HEDGE END (PEEL COMMON) STW"
Wet weather

The discharge

Spill day
Wednesday, 6 March 2024
Started
6 Mar 2024, 22:04
Ended
6 Mar 2024, 23:44
Duration
1 hour 40 minutes
Receiving water
Itchen
Parish
Hamble-le-Rice

Rainfall evidence

Daily rainfall at the matched gauge (Peel Common) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
06/03/2024 (spill day)0.08 mmdry
05/03/20244.46 mmrain
04/03/20243.95 mmrain
03/03/20240.09 mmdry
02/03/20240.89 mmrain

River flow that day: 11.549 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Southampton Water; Central Solent; Stanswood Bay; Approaches to Southampton Water
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
34 counted spills · 476 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00604). Rainfall: EA Hydrology gauge abb0cc5e-1e99-408b-aca4-d026aef724de. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Itchen Data.