← Bristol Third Way
Spill evidence · River Hub
Bristol Third Way
Combined sewer overflow · WXW01134 · feeds BRISTOL STW
Wet weather
The discharge
- Spill day
- Sunday, 24 November 2024
- Started
- 24 Nov 2024, 13:34
- Ended
- 25 Nov 2024, 02:14
- Duration
- 12 hours 40 minutes
- Receiving water
- Chestle Pill
- Parish
- Pilning and Severn Beach
Rainfall evidence
Daily rainfall at the matched gauge (Clifton Oakfield) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 24/11/2024 (spill day) | 30.8 mm | rain |
| 23/11/2024 | 30.4 mm | rain |
| 22/11/2024 | 2.8 mm | rain |
| 21/11/2024 | 0 mm | dry |
| 20/11/2024 | 0 mm | dry |
River flow that day: 97.768 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 8.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2024)
- 20 counted spills · 69 h total
- Monitor uptime (2024)
- 99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01134). Rainfall: EA Hydrology gauge e584b095-fa71-4106-b877-bfdd9a248d29. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Lower Severn Vale Data.