← Chiddingstone Causeway Ceo - 108598

Spill evidence · River Hub

Chiddingstone Causeway Ceo - 108598

Pumping station overflow · SWS00176 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Thursday, 15 January 2026
Started
15 Jan 2026, 15:36
Ended
15 Jan 2026, 22:20
Duration
6 hours 43 minutes
Receiving water
Lower Eden
Parish
Chiddingstone

Rainfall evidence

Daily rainfall at the matched gauge (Bough Beech) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
15/01/2026 (spill day)no data
14/01/2026no data
13/01/2026no data
12/01/2026no data
11/01/2026no data

River flow that day: 10.554 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00176). Rainfall: EA Hydrology gauge 5e4acea2-9e8f-4af4-a85e-1ce0805b394d. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Chiddingstone Causeway Ceo - 108598 — River Medway Data