← Holden Corner Tunbridge Wells, - 108656

Spill evidence · River Hub

Holden Corner Tunbridge Wells, - 108656

Combined sewer overflow · SWS00440 · feeds BIDBOROUGH STW
No rain data

The discharge

Spill day
Tuesday, 13 January 2026
Started
13 Jan 2026, 10:43
Ended
13 Jan 2026, 11:05
Duration
21 minutes 54 seconds
Receiving water
Barden Mill Stream
Parish
Southborough

Rainfall evidence

Daily rainfall at the matched gauge (Leigh) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
13/01/2026 (spill day)no data
12/01/2026no data
11/01/2026no data
10/01/2026no data
09/01/2026no data

River flow that day: 13.438 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00440). Rainfall: EA Hydrology gauge 14ad0c4f-65cc-4dd9-afd3-44f13ceaea7f_294452. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.