← Kilndown, - 116040

Spill evidence · River Hub

Kilndown, - 116040

Storm overflow at the works · SWS00472 · feeds KILNDOWN
No rain data

The discharge

Spill day
Saturday, 14 March 2026
Started
14 Mar 2026, 18:50
Ended
14 Mar 2026, 19:09
Duration
19 minutes 43 seconds
Receiving water
Tributary of Teise at Bedgebury
Parish
Goudhurst

Rainfall evidence

Daily rainfall at the matched gauge (Lamberhurst) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
14/03/2026 (spill day)no data
13/03/2026no data
12/03/2026no data
11/03/2026no data
10/03/2026no data

River flow that day: 6.655 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00472). Rainfall: EA Hydrology gauge 7e997ddd-1de6-49e8-9c4a-9306761e7638. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.