← Boarley Lane Penenden Heath Ceo - 108587
Spill evidence · River Hub
Boarley Lane Penenden Heath Ceo - 108587
Pumping station overflow · SWS00074 · feeds MAIDSTONE AND AYLESFORD STW
Wet weather
The discharge
- Spill day
- Wednesday, 18 November 2026
- Started
- 18 Nov 2026, 23:52
- Ended
- 19 Nov 2026, 02:03
- Duration
- 2 hours 10 minutes
- Receiving water
- Medway at Maidstone
- Parish
- Boxley
Rainfall evidence
Daily rainfall at the matched gauge (Boxley) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 18/11/2026 (spill day) | 19.26 mm | rain |
| 17/11/2026 | 2.16 mm | rain |
| 16/11/2026 | 17.78 mm | rain |
| 15/11/2026 | 2 mm | rain |
| 14/11/2026 | 0 mm | dry |
River flow that day: 4.487 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.3 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00074). Rainfall: EA Hydrology gauge a405c164-8f66-4e78-9351-cb90d9698b25. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.