← Withypitts Turners Hill Ceo - 108386

Spill evidence · River Hub

Withypitts Turners Hill Ceo - 108386

Pumping station overflow · SWS00960 · feeds WEST HOATHLY
No rain data

The discharge

Spill day
Sunday, 15 February 2026
Started
15 Feb 2026, 09:22
Ended
17 Feb 2026, 03:03
Duration
1 day 17 hours
Receiving water
Medway at Weir Wood
Parish
Turners Hill

Rainfall evidence

Daily rainfall at the matched gauge (Weir Wood) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
15/02/2026 (spill day)no data
14/02/2026no data
13/02/2026no data
12/02/2026no data
11/02/2026no data

River flow that day: 17.088 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00960). Rainfall: EA Hydrology gauge 9be538a5-e9a1-4633-9a3e-5b6c400bed5a. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Withypitts Turners Hill Ceo - 108386 — River Medway Data