← Cannon Lane Tonbridge, - 108596

Spill evidence · River Hub

Cannon Lane Tonbridge, - 108596

Combined sewer overflow · SWS00137 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Thursday, 5 February 2026
Started
5 Feb 2026, 17:05
Ended
5 Feb 2026, 19:35
Duration
2 hours 30 minutes
Receiving water
Mid Medway from Eden Confluence to Yalding
Parish
Capel

Rainfall evidence

Daily rainfall at the matched gauge (Leigh) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
05/02/2026 (spill day)no data
04/02/2026no data
03/02/2026no data
02/02/2026no data
01/02/2026no data

River flow that day: 40.511 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00137). Rainfall: EA Hydrology gauge 14ad0c4f-65cc-4dd9-afd3-44f13ceaea7f_294452. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.