← Coldharbour Lane Hildenborough Ceo - 108613

Spill evidence · River Hub

Coldharbour Lane Hildenborough Ceo - 108613

Pumping station overflow · SWS00190 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Sunday, 20 October 2024
Started
20 Oct 2024, 14:49
Ended
20 Oct 2024, 22:30
Duration
7 hours 40 minutes
Receiving water
Hilden Brook
Parish
Hildenborough

Rainfall evidence

Daily rainfall at the matched gauge (Kiln Wood) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
20/10/2024 (spill day)no data
19/10/2024no data
18/10/2024no data
17/10/2024no data
16/10/2024no data

River flow that day: 14.713 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
89 counted spills · 1211 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00190). Rainfall: EA Hydrology gauge 0ff20a05-799e-4bac-aaea-9dc69aef188c. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.