← Coldharbour Lane Hildenborough Ceo - 108613

Spill evidence · River Hub

Coldharbour Lane Hildenborough Ceo - 108613

Pumping station overflow · SWS00190 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Wednesday, 21 January 2026
Started
21 Jan 2026, 00:35
Ended
24 Jan 2026, 00:20
Duration
2 days 23 hours
Receiving water
Hilden Brook
Parish
Hildenborough

Rainfall evidence

Daily rainfall at the matched gauge (Kiln Wood) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
21/01/2026 (spill day)no data
20/01/2026no data
19/01/2026no data
18/01/2026no data
17/01/2026no data

River flow that day: 34.598 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00190). Rainfall: EA Hydrology gauge 0ff20a05-799e-4bac-aaea-9dc69aef188c. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Coldharbour Lane Hildenborough Ceo - 108613 — River Medway Data