← Bidborough, - 115882

Spill evidence · River Hub

Bidborough, - 115882

Storm overflow at the works · SWS00063 · feeds BIDBOROUGH STW
No rain data

The discharge

Spill day
Tuesday, 5 March 2024
Started
5 Mar 2024, 07:59
Ended
5 Mar 2024, 08:53
Duration
54 minutes 46 seconds
Receiving water
Barden Mill Stream
Parish
Speldhurst

Rainfall evidence

Daily rainfall at the matched gauge (Saints Hill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
05/03/2024 (spill day)no data
04/03/2024no data
03/03/2024no data
02/03/2024no data
01/03/2024no data

River flow that day: 14.196 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
74 counted spills · 668 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00063). Rainfall: EA Hydrology gauge a415ac0a-7305-4724-a199-c5f589618f38. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.